Feasibility Study
At AVYESH SOLAR, the Feasibility Study is a critical step in the Pre-Bid Engineering process. It ensures that every proposed solar project is not only technically sound but also commercially and environmentally viable. This in-depth evaluation helps us minimize risks, optimize design, and align project goals with real-world constraints.
Key Components of Our Feasibility Study
Site Assessment
Solar irradiance and climatic conditions
Shading and terrain analysis
Land availability and suitability (soil, topography, water table)
Accessibility and logistics
Technical Evaluation
Optimal system sizing and configuration
Module, inverter, and structure selection
Layout optimization using tools like PVsyst and Helioscope
Energy yield estimation and performance ratio calculations
Regulatory & Grid Analysis
Compliance with national/international codes and standards
Grid connectivity and substation proximity
Utility requirements and net metering policies
Financial Viability
CAPEX and OPEX estimation
ROI, payback period, and LCOE (Levelized Cost of Energy)
Sensitivity analysis under different financial and performance scenarios
Environmental and Social Impact
Preliminary EIA (Environmental Impact Assessment)
Assessment of local community impact and sustainability considerations
Outcome
The feasibility study results in a comprehensive report that informs:
Go/No-Go decision making
Proposal customization
Client confidence
Project risk mitigation